During the last two weeks the inside walls were prepared and the painters could finally start doing their work. It's great to see how a building site slowly transforms into a future home. The ceilings already have their final coating of paint. So far we are still on schedule, but Xmas break is ahead and hopefully this will not slow down the progress too much. The painters were even working on Sunday.
The outside walls have a first render. They still need to be painted.
During the last couple of days we had some Nor'wester winds. (Foehn). Sometimes it looked liked the sky was on fire. I will never get used to those crazy jumps in temperatures.